Monday, November 9, 2009

Drawing approval

Before you enter the ME machine shop to make something, you must have a GSI sign off on the corresponding drawing(s). This can be any GSI, e.g., the GSI on staff in 1131 before you enter the shop. Bob and Marv will look for the GSI's signature on the drawing before letting you begin manufacturing.

No comments:

Post a Comment